Bridge replacement project on U.S. 40 over the Embarras River begins March 16

Portion of U.S. 40 between Montrose and Greenup to be closed for eight months

EFFINGHAM – The Illinois Department of Transportation announced the closure of U.S. 40 beginning March 16 between Cumberland Road and South Jefferson Street in Cumberland County for a bridge replacement project over the Embarras River.

A detour will be posted directing traffic to Interstate 70 utilizing Illinois 130 in Greenup and Spring Creek Road in Montrose. This project will improve safety and the smoothness of the pavement along U.S. 40 for the traveling public. The project is expected to be completed in November.

Motorists are encouraged to follow the posted detour and allow extra time for trips through this area. Drivers are urged to pay close attention to changed conditions and obey the posted speed limits.

Over the next six years, IDOT is planning to improve more than 3,200 miles of highway and nearly 9 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide on 7,897 miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 7 updates, follow us on Twitter at @IDOTDistrict7 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

# # #

 

 

Share

Latest stories

Website preview
Eastbound I-74 closure in Knox County
GALESBURG – The Illinois Department of Transportation announced this evening that eastbound Interstate 74 in Knox County is closed for emergency pavement repairs to the bridge deck over the Spoon River. Traffic is being detoured to U.S. 150.
illinois-department-of-transportation.prezly.com
Website preview
Illinois 31 bridge repairs begin April 28
CHICAGO – The Illinois Department of Transportation announced today that repairs to the Illinois 31 (Richmond Road) bridge over Nippersink Creek (between Harts and Solon roads) in Ringwood will begin, weather permitting, Tuesday, April 28.
illinois-department-of-transportation.prezly.com
Website preview
State Street resurfacing begins April 20
CHICAGO – The Illinois Department of Transportation announced today that patching and resurfacing of State Street from Steger Road to Sauk Trail in Steger and South Chicago Heights will require intermittent daytime lane closures beginning, weather permitting, Monday, April 20.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov