Cedar Street Bridge inspection begins March 11
PEORIA – The Illinois Department of Transportation announced that an inspection of the Cedar Street Bridge (Illinois 8/116/MacArthur Highway) over the Illinois River begins March 11.
The routine inspection will reduce the bridge to one lane in each direction between 8:30 a.m. and 3:30 p.m. each day through March 30, weather permitting.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
For more information on IDOT projects, click here. For IDOT District 4 updates, follow us on Twitter at @IDOTDistrict4 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com and www.gettingaroundpeoria.com.
Kimberly Hoskins
Paul Wappel