I-280 Mississippi River bridge inspection begins Aug. 10
ROCK ISLAND – The Illinois Department of Transportation announced today that weather permitting, the right lane on the westbound Interstate 280 Mississippi River bridge near Rock Island will be closed from Monday, Aug. 10, through Wednesday, Aug. 12, for a routine bridge inspection. The closure will then move to the eastbound span Aug. 12 through Friday, Aug. 14, to complete the inspection.
Signing will be utilized to maintain traffic during the project, which is scheduled to be completed by 3 p.m. Aug. 14
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area when feasible, the use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices, and be alert for workers and equipment.
For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.
###
Kristophere’ Owens
Paul Wappel


