I-55 at Illinois 17 interchange to close overnight Feb. 3 and 4

OTTAWA – The Illinois Department of Transportation announced today that weather permitting, Interstate 55 at the Illinois 17 interchange (exit 217) in Dwight will be closed for two consecutive nights on Monday, Feb. 3 and Tuesday, Feb. 4. The closure is necessary to install structural steel on the south half of the Illinois 17 bridge over I-55.

The closures will begin at 7:30 p.m. each night and end at 7 a.m. the following morning. Traffic will be detoured off and onto I-55 using the exit and entrance ramps at Illinois 17. Illinois 17 will be open to one lane in each direction on the north half of the bridge and traffic at the intersections will be controlled by flaggers.

The work is part of a $9.1 million project to replace the Illinois 17 bridge over I-55. The project is expected to be completed this summer.

Motorists can expect delays and should allow extra time for trips through this area and be prepared for slow and stopped traffic. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices, and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve more than 3,000 miles of highway and nearly 10 million square feet of bridge deck as part of the Rebuild Illinois capital program, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Four of Rebuild Illinois included approximately $12.1 billion of improvements statewide on 5,339 miles of highway, 533 bridges and 762 additional safety improvements.

For IDOT District 3 updates on X, follow us at @IDOTDistrict3. View area construction details on IDOT’s traveler information map at www.GettingAroundIllinois.com.

 

Share

Latest stories

Website preview
Illinois 203 lane closures in St. Clair County begin May 11
MADISON – The Illinois Department of Transportation today announced that road repairs on Illinois 203 between Collinsville Road and the Madison County line in St. Clair County will require daily lane closures beginning, weather permitting, Monday, May 11. The closures will affect both northbound and southbound lanes. Motorists should expect delays and are encouraged to use alternate routes during the closure. Drivers are urged to reduce speed, remain alert for changing conditions, obey all construction signage, and refrain from using mobile devices while approaching and traveling through the work zone. The project is expected to be completed by early summer 2026.
illinois-department-of-transportation.prezly.com
Website preview
Lane closures on I-55/70 in St. Clair County begin May 18
MADISON – The Illinois Department of Transportation is continuing multiple coordinated improvements along the Interstate 55/70 corridor in St. Clair County to improve safety, mobility and road conditions. Beginning Monday, May 18, lane closures will be in place at the following locations to allow for pavement and structure repairs. Eastbound I-55/70 Between Exchange Avenue and Black Lane, traffic will be reduced to: • Two lanes during peak hours (approximately 4 p.m. to 6 p.m.) • One or two lanes during off-peak hours, as needed
illinois-department-of-transportation.prezly.com
Website preview
Pauling Road over I-57 bridge repairs begins May 11
CHICAGO – The Illinois Department of Transportation announced today that a project to repair the bridge that carries Pauling Road over Interstate 57, in Will County, will begin, weather permitting, Monday, May 11.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov