I-80 Mississippi River bridge washing begins April 20

ROCK ISLAND COUNTY – The Illinois Department of Transportation announced today that weather permitting, maintenance on the Interstate 80 Mississippi River bridge in Rock Island County will begin Monday, April 20.

Work will wash the bridge. Traffic will be reduced to one lane in each direction from 8 p.m. each evening to 6 a.m. the following morning. The work is anticipated to be completed in two weeks.

A second bridge washing is scheduled in September. These operations are imperative to promote the longevity of Illinois’ infrastructure system, while ensuring their safety.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

 

 

Share

Latest stories

Website preview
Eastbound I-74 closure in Knox County
GALESBURG – The Illinois Department of Transportation announced this evening that eastbound Interstate 74 in Knox County is closed for emergency pavement repairs to the bridge deck over the Spoon River. Traffic is being detoured to U.S. 150.
illinois-department-of-transportation.prezly.com
Website preview
Illinois 31 bridge repairs begin April 28
CHICAGO – The Illinois Department of Transportation announced today that repairs to the Illinois 31 (Richmond Road) bridge over Nippersink Creek (between Harts and Solon roads) in Ringwood will begin, weather permitting, Tuesday, April 28.
illinois-department-of-transportation.prezly.com
Website preview
State Street resurfacing begins April 20
CHICAGO – The Illinois Department of Transportation announced today that patching and resurfacing of State Street from Steger Road to Sauk Trail in Steger and South Chicago Heights will require intermittent daytime lane closures beginning, weather permitting, Monday, April 20.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov