Illinois 150 in Chester closing Monday for bridge demolition

CHESTER – The Illinois Department of Transportation announced today that Illinois 150 in Chester will close Monday, Sept. 28, to accommodate the scheduled demolition of the old Chester Bridge connecting Chester, Ill., and Perryville, Mo., over the Mississippi River.

The closure is necessary to establish a safe area for the controlled demolition. The Missouri Department of Transportation has announced that the demolition is scheduled for approximately 8:30 a.m. Monday, weather permitting.

Roads within a 1,000-foot perimeter of the bridge will close before the demolition. They are expected to remain closed for approximately 15 minutes while the demolition takes place and the area is cleared.

The Don Welge Memorial Bridge will close approximately 15 minutes before the demolition and is expected to reopen approximately 15 minutes afterward.

If you are traveling in Chester, plan ahead, allow extra time and follow posted signs and directions from law enforcement and traffic control personnel.

For additional details about the demolition, including the anticipated schedule and safety information, visit the MoDOT’s Don Welge Memorial Bridge project webpage at www.modot.org/DonWelge. For local traffic control and detour information in Chester, the public should follow information provided by the city via its website: www.chesterill.com

Built in 1942, the old bridge was replaced this summer with a new $307.1 million modernized structure made possible through a partnership between Missouri and Illinois, with IDOT investing approximately $143.2 million in the bridge and the Illinois approach through Gov. Pritzker’s Rebuild Illinois capital program.

For IDOT District 8 updates, follow us on the social media platform X at @IDOTDistrict8 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com. ​

​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ # # #

 

 

 

 

Share

Latest stories

Traffic patterns at I-39 and Illinois 38 interchange in Rochelle to change Nov. 16

Traffic patterns at I-39 and Illinois 38 interchange in Rochelle to change Nov. 16

ROCHELLE – The Illinois Department of Transportation announced today that there will be a traffic pattern change at the interchange of Interstate 39 and Illinois 38 in Rochelle. Beginning Monday, Nov. 16, traffic shifts will be done to convert the interchange from a diamond into a diverging diamond design on Illinois 38 as part of a $23.9 million project.

illinois-department-of-transportation.prezly.com

Work at rail crossing at Illinois 64 in Kings begins Nov. 16

Work at rail crossing at Illinois 64 in Kings begins Nov. 16

KINGS – The Illinois Department of Transportation announced today that weather permitting, Illinois 64 at the Illinois Railway crossing in Kings will be closed for repairs on Monday, Nov. 16. The crossing is 2 miles west of Illinois 251.

illinois-department-of-transportation.prezly.com

Weekend lane closures on eastbound I-80 in Joliet

Weekend lane closures on eastbound I-80 in Joliet

Major travel delays are anticipated, alternative routes are strongly encouraged

illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov