UPDATE 4/16/26: Illinois 23 construction in Ottawa begins March 23

UPDATE 4/16/26: The I-80 ramps to Illinois 23 in Ottawa will be closed for pavement patching from 6 p.m. Monday, April 20, to 10 a.m., Tuesday, April 21. The ramps to I-80 from Illinois 23 will remain open.

DETOURS TO REACH ILLINOIS 23 AND OTTAWA:

From eastbound I-80: Take Exit 81 and go south on Illinois 178 and use U.S. 6 east.

From westbound I-80: Take Exit 93 and go west on Illinois 71.

OTTAWA – The Illinois Department of Transportation announced that weather permitting, work will begin on Illinois 23 bridge over Interstate 80 in Ottawa on Monday, March 23.

Work will repair the bridge deck and will include the replacement of expansion joints and the application of a latex overlay. Also, there will be pavement patching between Stevenson Road and Etna Road. There will be one lane open in each direction and all traffic will be shifted to one side of the bridge. Lanes will have a 9-foot, 6-inch width restriction and vehicle length restrictions will be reduced to 70 feet for tight turning movements.

Pavement patching between Stevenson Road and Etna Road will take approximately two to three weeks, and patching near the I-80 entrance and exit ramps will be completed during the off-peak traffic times between 6 p.m. and 10 a.m. This $1.8 million project is expected to be completed in October.

Drivers are urged to pay close attention to changed conditions and signs in the work zone areas, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 3 updates on X, follow us at @IDOTDistrict3. View area construction details on IDOT’s traveler information map at www.GettingAroundIllinois.com.

 

 

Share

Latest stories

Website preview
Westbound I-64 lane closures in St. Clair County for traffic control reconfiguration
CASEYVILLE – The Illinois Department of Transportation today announced lane closures on westbound Interstate 64 between Illinois 159 and Illinois 157 for a traffic control reconfiguration beginning at 12 a.m. Sunday, April 26, reducing traffic to one lane. The lanes are expected to reopen by 6 a.m. on Monday, April 27.
illinois-department-of-transportation.prezly.com
Website preview
Foster Avenue ramp to outbound Kennedy to close May 4
CHICAGO – The Illinois Department of Transportation announced today that as part of ongoing efforts to rebuild the bridge carrying Foster Avenue over the Kennedy Expressway (Interstate 90), in Chicago, a ramp closure along with overnight lane closures are scheduled to begin, weather permitting, Monday, May 4.
illinois-department-of-transportation.prezly.com
Website preview
U.S. 20 in Jo Daviess County reopens
12-day closure aided in $31.6 million reconstruction project
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov