Public advised to remain alert for pavement failures during heat wave

IDOT closely monitoring road conditions; on standby for emergency repairs

SPRINGFIELD – With extremely high temperatures and humidity impacting the entire state, the Illinois Department of Transportation is cautioning the public to be on the lookout for pavement failures on roads and to stay alert for crews making emergency repairs. ​

Pavement failures, buckling and blowouts occur with little warning during periods of prolonged heat and humidity, resulting in uneven driving surfaces. While it’s impossible to predict where or when these failures might occur, maintenance personnel will be monitoring road conditions and on standby to make repairs as quickly as possible when they are observed and reported. ​

Pavement failures can be reported to IDOT by calling 800-452-4368 or by reaching out to law enforcement via 911.

The public is advised to anticipate slowing traffic and move over for workers and other emergency personnel when repairs are being made.

Additionally, if you are traveling during extreme heat, pack extra water. Becoming stranded could be dangerous without proper hydration, as dehydration can happen quickly.

For more information about pavement failures and how they occur, take a look at this educational video created by IDOT.

# # #

 

 

 

 

 

 

 

 

Share

Latest stories

Website preview
Illinois 59 resurfacing begins July 13
CHICAGO – The Illinois Department of Transportation announced today that patching and resurfacing of Illinois 59 from McCoy Drive to Artesian Road, in Naperville and Aurora, will require intermittent daytime lane closures beginning, weather permitting, Monday, July 13.
illinois-department-of-transportation.prezly.com
Website preview
Mannheim Road resurfacing begins July 7
CHICAGO – The Illinois Department of Transportation announced today that resurfacing of Mannheim Road (U.S. 12/45) from Prospect Avenue to Higgins Road (Illinois 72), in Des Plaines and Rosemont, will require intermittent daytime lane closures beginning, weather permitting, Tuesday, July 7.
illinois-department-of-transportation.prezly.com
Website preview
Addison Street resurfacing begins July 6
CHICAGO – The Illinois Department of Transportation announced today that resurfacing of Addison Street from Cumberland Avenue (Illinois 171) to Forest Preserve Drive, in Chicago, will require intermittent daytime lane closures beginning, weather permitting, Monday, July 6.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov