U.S. 150 closures on McClugage for demolition set April 30

PEORIA – The Illinois Department of Transportation announced that beginning at approximately 9:30 a.m. Wednesday April 30, weather permitting, roads around the U.S. 150 McClugage Bridge will close as demolition continues on the old eastbound McClugage Bridge.

The road closures are necessary as the contractor utilizes explosives to sever the steel to the main truss section of the old bridge. The closures are expected to last at least one hour. Traffic will be routed off U.S. 150 at interchange ramps and will be continuously moving. No stopping on U.S. 150 will be allowed. ​

This will be the fourth of eight separate similar events to remove components of the old structure. The explosives will be detonated once the roads are closed, the security perimeter is deemed safe and the contractor has performed their final safety checks. No specific time can be given for the detonation.

During each of these bridge demolition events, the following roads will be closed to all traffic:

  • Both directions of U.S. 150 between Illinois 29 (Adams Street) and Illinois 116
  • Ramps from Illinois 116 to westbound U.S. 150
  • Lorentz Avenue from Illinois 29 to the Illinois River ​

Anyone wishing to watch this or any of the events in person is reminded that a security perimeter around the blast area will be in effect on land and in the water. (See attached PDF for more details.) Pedestrians are also asked to be mindful of venturing onto private property without the property owners’ permission.

Drones will be used by the contractor performing this work as a mechanism to verify a safe and successful detonation. As such, civilian drones will be required to stay at least 1,000 feet north of the bridge and at least 300 feet above the ground. Any incursions into this area may cause postponement of the blast and the drone pilot liable for delays to the contractor.

~McClugageCombined-4.11.pdf

PDF 8.8 MB

 

Share

Latest stories

Website preview
Adams Street lane closures begin April 13
PEORIA – The Illinois Department of Transportation announced that intermittent daytime lane closures on Adams Street (Illinois 29) between Eureka Street and Lorentz Avenue in Peoria begin April 13.
illinois-department-of-transportation.prezly.com
Website preview
Illinois 40 bridge replacement at I-80 underway
BUREAU COUNTY – The Illinois Department of Transportation announced that work is underway on the replacement of the Illinois 40 bridge crossing Interstate 80 in Bureau County.
illinois-department-of-transportation.prezly.com
Website preview
Work on Atkinson Road in Henry County begins April 13
HENRY COUNTY – The Illinois Department of Transportation announced today that weather permitting, work on Atkinson Road in Henry County will begin Monday, April 13. The work zone is from Illinois 92 to N. 1920th Street at the north Atkinson village limits and includes the ramps at the Interstate 80 Atkinson interchange.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov