U.S. 30 Gateway Bridge inspection begins Nov. 16
WHITESIDE COUNTY – The Illinois Department of Transportation announced today that weather permitting, work on the U.S. 30 Gateway Bridge over the Mississippi River will begin Monday, Nov. 16.
Work will consist of inspecting the structure. There will be daily lane closures from 8 a.m. to 3 p.m., with one lane of traffic controlled by flaggers. The work is anticipated to be completed by 3 p.m. on Wednesday, Nov. 18.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area when feasible, the use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.
Kristophere’ Owens
Paul Wappel



