U.S. 30 Gateway Bridge inspection begins Nov. 16

WHITESIDE COUNTY – The Illinois Department of Transportation announced today that weather permitting, work on the U.S. 30 Gateway Bridge over the Mississippi River will begin Monday, Nov. 16.

Work will consist of inspecting the structure. There will be daily lane closures from 8 a.m. to 3 p.m., with one lane of traffic controlled by flaggers. The work is anticipated to be completed by 3 p.m. on Wednesday, Nov. 18.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area when feasible, the use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

 

 

Share

Latest stories

Temporary ramp closures on outbound Bishop Ford

Temporary ramp closures on outbound Bishop Ford

CHICAGO – The Illinois Department of Transportation announced today that resurfacing of the Bishop Ford Freeway (Interstate 94) ramps will require temporary ramp closures between Dolton Avenue and 159th Street (U.S. 6) over five consecutive days beginning, weather permitting, Saturday, Nov. 14.

illinois-department-of-transportation.prezly.com

*Media Advisory*

*Media Advisory*

'Winter Weather – Get it Together’

illinois-department-of-transportation.prezly.com

                          *Media Advisory*

*Media Advisory*

‘Winter Weather – Get it Together’

illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov