U.S. 30 Mississippi River bridge work is underway
WHITESIDE COUNTY – The Illinois Department of Transportation has announced today that work is underway on the U.S. 30 Mississippi River bridge near Fulton. Work will include a bridge inspection and repairs to the structure.
One lane will be closed on the bridge from 8 a.m. to 2 p.m. daily. Flaggers and signs will be used to maintain traffic during the project, which is scheduled to be completed by 2 p.m. Friday, Nov. 14.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.
Kristophere’ Owens
Paul Wappel
