U.S. 34 Little Indian Creek bridge replacement begins Sept. 21

Bridge is second of two to be done under new design-build initiative

LA SALLE COUNTY – The Illinois Department of Transportation announced that weather permitting, construction on the U.S. 34/Illinois 23 bridge crossing Little Indian Creek in La Salle County will begin Monday, Sept. 21. The bridge is located 4 miles west of Somonauk and a half-mile west of the eastern junction of U.S. 34 and Illinois 23.

The project will replace the bridge. U.S. 34/Illinois 23 will be closed to traffic at the bridge and motorists will follow a posted detour using Illinois 23, Interstate 80 and Illinois 71. Access to residences and businesses within the project limits will be maintained as feasible throughout construction, which is expected to be complete in January.

The $11 million project is the second of two bridges that will be replaced under a new IDOT innovative delivery process. The first project, a replacement of the U.S. 52 bridge over the Fox River near Serena, began in July and is expected to be completed at the end of the year. These projects will be done using design-build, which expedites the construction process by selecting a team composed of a design engineer and contractor.

Motorists can expect delays and should allow extra time for trips through this area and be prepared for slow and stopped traffic. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices, and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Seven of Rebuild Illinois include $25.6 billion of improvements statewide to 24,498 lane miles of highway, 959 bridges and 1,475 additional safety improvements.

For IDOT District 3 updates on X, follow us at @IDOTDistrict3. View area construction details on IDOT’s traveler information map at www.GettingAroundIllinois.com.

 

 

Share

Latest stories

Website preview
Lane closures on eastbound I-64 in Washington and Clinton counties
NEW BADEN/RICHVIEW — The Illinois Department of Transportation today announced upcoming lane closures on eastbound Interstate 64 between Illinois 160 and U.S. 51 in Washington and Clinton counties, beginning Monday, Nov. 2, weather permitting.
illinois-department-of-transportation.prezly.com
Website preview
Website preview
Lane and ramp closures on I-55/70 in Madison County begin Nov. 2
MARYVILLE – The Illinois Department of Transportation today announced upcoming lane and ramp closures on Interstate 55/70 in both directions in Madison County to allow for pavement and structure repairs.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov