U.S. 34 Mississippi River bridge work begins Sept. 9

GULFPORT – The Illinois Department of Transportation announced that construction on the U.S. 34 bridge over the BNSF railroad just east of the Mississippi River in Henderson County begins Sept. 9.

The project involves bridge joint replacement, structural steel repairs, slopewall repairs and a bridge deck overlay. U.S. 34 on the bridge will be reduced to one lane in each direction during the work, which is expected to be complete in June 2025.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For more information on IDOT projects, click here. For IDOT District 4 updates, follow us on Twitter at @IDOTDistrict4 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com and www.gettingaroundpeoria.com.

Kimberly Hoskins

Communications Outreach Liaison – Region 3 (District 4, District 5), Illinois Department of Transportation

 

 

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov