Work on eastbound Bypass U.S. 20 in Rockford April 22

ROCKFORD – The Illinois Department of Transportation announced today that construction on the eastbound lanes of Bypass U.S. 20 will be done on Wednesday, April 22. Work will focus on restriping the lanes near and on the bridge crossing Kishwaukee Street between the Illinois 2 (South Main Street) and Illinois 251 (11th Street) interchanges.

The bridge was reduced to one lane following damage to the bridge caused by a truck with an oversized load on April 16, and the work will revise the existing lane closure to accommodate two lanes. Work will be done from 9 a.m. to 2 p.m. The ramp from Illinois 2 to eastbound U.S. 20 will be closed during the work, and there will be rolling traffic closures starting from the Meridian Road interchange and ending at the Illinois 251 interchange. Once traffic is restored, this new lane configuration will be in place indefinitely until repairs can be made.

Drivers are urged to pay close attention to changed conditions and signs in the work zone areas, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

Beam damage on the eastbound Bypass U.S. 20 bridge crossing Kishwaukee Street in Rockford. A truck with an oversized load struck the bridge on Thursday, April 16.

 

 

Share

Latest stories

Website preview
Resurfacing project on south Dirksen Parkway begins today
SPRINGFIELD – The Illinois Department of Transportation announced that a 1.6-mile resurfacing project on Dirksen Parkway from Stevenson Drive to just south of South Grand Avenue begins today. Work is expected to be completed by the beginning of August.
illinois-department-of-transportation.prezly.com
Website preview
Eastbound I-74 closure in Knox County
GALESBURG – The Illinois Department of Transportation announced this evening that eastbound Interstate 74 in Knox County is closed for emergency pavement repairs to the bridge deck over the Spoon River. Traffic is being detoured to U.S. 150.
illinois-department-of-transportation.prezly.com
Website preview
Illinois 31 bridge repairs begin April 28
CHICAGO – The Illinois Department of Transportation announced today that repairs to the Illinois 31 (Richmond Road) bridge over Nippersink Creek (between Harts and Solon roads) in Ringwood will begin, weather permitting, Tuesday, April 28.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov