Work on Mississippi River bridges begins May 1

DIXON – The Illinois Department of Transportation announced today that work on three Mississippi River bridges in Rock Island, Whiteside and Carroll counties will begin Friday, May 1.

The project will wash the following bridges:

  • Centennial Bridge (U.S. 67) in Rock Island
  • Gateway Bridge (U.S. 30) in Fulton
  • Dale Gardner Veterans Memorial Bridge (U.S. 52/Illinois 64) in Savanna

There will be daytime and nighttime lane closures controlled by flaggers. All work is expected to be completed by the end of July.

Drivers are urged to pay close attention to changed conditions and signs in the work zone areas, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com. ​

 

 

Share

Latest stories

Website preview
Wood Street/Ashland Avenue lane closures begin May 4
CHICAGO – The Illinois Department of Transportation announced today that as part of ongoing improvements on Wood Street/Ashland Avenue from south of Thornton Road, in Dixmoor, to 158th Street, in Harvey, municipal water main replacement will require intermittent daytime lane closures beginning, weather permitting, Monday, May 4.
illinois-department-of-transportation.prezly.com
Website preview
Overnight closures on 95th Street, Harlem Avenue
CHICAGO – The Illinois Department of Transportation announced today that as part of ongoing efforts to rehabilitate the bridges carrying Harlem Avenue (Illinois 43) over 95th Street (U.S. 12/20), in Bridgeview, Chicago Ridge and Oak Lawn, overnight lane closures, accompanied by 15-minute full traffic stops, are scheduled to take place on 95th Street and on Harlem Avenue over three consecutive nights beginning, weather permitting, Monday, May 4. The closures are necessary to safely remove steel beams from the existing bridge structure over the road.
illinois-department-of-transportation.prezly.com
Website preview
Full closure on I-55 at I-80 over two consecutive nights
CHICAGO – The Illinois Department of Transportation announced today that as part of ongoing efforts to rebuild the Interstate 80 bridges over Interstate 55, in Joliet, Channahon and Shorewood, a full closure will be required in both directions of I-55 at I-80 over two consecutive nights, beginning, weather permitting, Tuesday, May 5. The closures are necessary to safely install steel beams on the I-80 bridge over the expressway.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov