Work on U.S. 20 over Galena River begins May 4

GALENA – The Illinois Department of Transportation announced today that weather permitting, construction on the bridge carrying U.S. 20/Illinois 84 across the Galena River will begin Monday, May 4.

Work will patch the bridge deck. One lane will be open in the work zone controlled by temporary traffic signals. The bridge also will be open to pedestrian traffic throughout the project.

Work be suspended and all lanes will be open during the Memorial Day holiday weekend. Lane closures will resume after the holiday and the project is expected to be completed by the end of June.

Drivers are urged to pay close attention to changed conditions and signs in the work zone areas, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

U.S. 20/Illinois 84 bridge over the Galena River in Galena.

 

 

Share

Latest stories

Website preview
Weekend lane closures on eastbound I-80 in Joliet
Major travel delays are anticipated, alternative routes are strongly encouraged
illinois-department-of-transportation.prezly.com
Website preview

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov