Illinois 116 work in Pontiac begins May 11

PONTIAC – The Illinois Department of Transportation announced today that weather permitting, work on Illinois 116 (Reynolds Street) in Pontiac will begin Monday, May 11. The work zone will be between Countryside Lane/N 1450E Road and Turtle Creek.

Work will remove three culverts that cross Countryside Lane and the driveways of two residences and replace them with a continuous concrete box culvert. Additional work includes ditch cleaning, pavement removal and replacement, and landscaping. Traffic on Illinois 116 will be prohibited from turning onto Countryside Lane and will follow a posted detour. Work is scheduled to be completed by the end of July.

Drivers are urged to pay close attention to changed conditions and signs in the work zone areas, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve 7,107 lane miles of highway and 8.4 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide to 21,309 lane miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 3 updates on X, follow us at @IDOTDistrict3. View area construction details on IDOT’s traveler information map at www.GettingAroundIllinois.com.

 

 

Share

Latest stories

Website preview
Lane closures on I-55/70 in St. Clair County begin May 18
MADISON – The Illinois Department of Transportation is continuing multiple coordinated improvements along the Interstate 55/70 corridor in St. Clair County to improve safety, mobility and road conditions. Beginning Monday, May 18, lane closures will be in place at the following locations to allow for pavement and structure repairs. Eastbound I-55/70 Between Exchange Avenue and Black Lane, traffic will be reduced to: • Two lanes during peak hours (approximately 4 p.m. to 6 p.m.) • One or two lanes during off-peak hours, as needed
illinois-department-of-transportation.prezly.com
Website preview
Pauling Road over I-57 bridge repairs begins May 11
CHICAGO – The Illinois Department of Transportation announced today that a project to repair the bridge that carries Pauling Road over Interstate 57, in Will County, will begin, weather permitting, Monday, May 11.
illinois-department-of-transportation.prezly.com
Website preview
154th Street over the Bishop Ford bridge rehab begins May 11
CHICAGO – The Illinois Department of Transportation announced today that rehabilitation of the bridge carrying 154th Street over the Bishop Ford Freeway (Interstate 94), in Dolton, will begin, weather permitting, Monday, May 11. The project is part of the ongoing Bishop Ford rehabilitation and modernization.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov