Illinois 75 Pecatonica River bridge work begins June 1

WINNEBAGO COUNTY – The Illinois Department of Transportation announced today that weather permitting, work on the Illinois 75 bridge crossing the Pecatonica River will begin Monday, June 1. The bridge is located in Harrison.

Work will repair the westbound lane of the bridge. One lane will be open and maintained by temporary traffic signals, and the northern leg of Harrison Road will be closed during the project, which is scheduled to be completed by 3 p.m. Friday, June 12.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, alternate routes should be considered when feasible. Drivers are urged to pay close attention to changed conditions and signs in the work zone, obey posted speed limits, refrain from using mobile devices, and be alert for workers and equipment.

For IDOT District 2 updates, follow us on X, formerly known as Twitter at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

 

 

Share

Latest stories

Website preview
Website preview
Traffic patterns around McClugage Bridge to shift
PEORIA – The Illinois Department of Transportation announced that as part of ongoing construction around the McClugage Bridge (War Memorial Drive/U.S. 150) in Peoria, traffic patterns in the area will change starting this evening:
illinois-department-of-transportation.prezly.com
Website preview
Ramp closures in Peoria begin June 2
PEORIA – The Illinois Department of Transportation announced the closures of several ramps at the Interstate 74/474/Illinois 6 and U.S. 150/Illinois 6 interchanges beginning June 2.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov