Illinois 97 bridge work begins Oct. 7
ASTORIA – The Illinois Department of Transportation announced that repairs to the U.S. 24 bridge over the BNSF railroad about 4 miles west of Astoria in Fulton County begins Oct. 7.
The project involves bridge deck patching, joint replacement and safety improvements. Work will reduce the bridge to one lane, with traffic controlled by temporary signals, until June 2026.
Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.
For more information on IDOT projects, click here. For IDOT District 4 updates, follow us on Twitter at @IDOTDistrict4 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com and www.gettingaroundpeoria.com.
Over the next six years, IDOT is planning to improve more than 3,200 miles of highway and nearly 9 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide on 7,897 miles of highway, 815 bridges and 1,181 additional safety improvements.

Kimberly Hoskins
Paul Wappel