Outbound I-55 at Joliet Road lane closure

CHICAGO – The Illinois Department of Transportation announced today that for safety reasons the work zone on outbound Interstate 55 at Joliet Road has been reconfigured. The three lanes, split with one on the left and two on the right over the bridge, was removed and replaced with two continuous right lanes.

There also will continue to be no shoulders throughout the work zone in both directions of I-55. Entrances, exits and inbound I-55 will remain the same.

The public should continue to expect lane shifts, overnight lane closures and significant delays and to allow extra time for trips through this area. Alternative routes are encouraged. Drivers are urged to pay close attention to flaggers and signs in the work zones, obey the posted speed limits and be on the alert for workers and equipment.

The $17.7 million project consists of replacing the existing I-55 bridges over Illinois 53 and Joliet Road with new wider structures, new deck overlays and approaches, resurfacing and new lighting. Work at I-55 over Illinois 53 was completed in 2024. I-55 over Joliet Road is anticipated to be completed by the end of this year.

Over the next six years, IDOT is planning to improve more than 3,200 miles of highway and nearly 9 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Five of Rebuild Illinois include approximately $16 billion of improvements statewide on 6,541 miles of highway, 686 bridges and 986 additional safety improvements.

For more information on IDOT projects, click here. Find traffic and road conditions at www.gettingaroundillinois.com. You also can follow IDOT on Facebook and X.

 

# # #

 

 

Share

Latest stories

Website preview
Public comment sought on proposed Relocated Illinois 3 improvements in St. Clair County
ST. CLAIR COUNTY – The Illinois Department of Transportation will hold a public meeting to discuss a study for the proposed improvements to approximately two miles of the Relocated Illinois 3 corridor in East St. Louis and Sauget. The meeting will be held:
illinois-department-of-transportation.prezly.com
Website preview
Pavement patching on I-70 in Bond County begins Nov. 3
GREENVILLE – The Illinois Department of Transportation today announced that Interstate 70 will be reduced to one lane in each direction between the Madison County line and the Fayette County line in Bond County beginning, weather permitting, Monday, Nov. 3, for pavement patching.
illinois-department-of-transportation.prezly.com
Website preview
Work on Interstate 72 bridges in Pike County begins Nov. 3
SPRINGFIELD – The Illinois Department of Transportation announced that work will begin on several bridges on Interstate 72 in Pike County between the New Salem/Pittsfield interchange (exit 31) and the Hull/Payson interchange (exit 10). Work will begin with pre-stage widening of the bridge shoulders starting Monday, Nov. 3. Work will continue in March with resurfacing and painting the bridge decks.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov