Resurfacing project on U.S. 67 in Morgan County begins July 30

SPRINGFIELD – The Illinois Department of Transportation announced that a resurfacing project on U.S. 67 from the Cass County/Morgan County line to approximately 2 miles east of the Illinois 100/Spunky Ridge Road intersection, east of Meredosia, begins Wednesday, July 30. Work is expected to be completed next year. ​

In addition to resurfacing, other work includes bridge repairs and maintenance, replacing guardrails, upgrading drainage, and improving shoulders by adding shoulder rumble strips. Lane closures are expected, and temporary traffic signals, flaggers and cones will be used to direct traffic through the work zones. When work is occurring on the bridge, there will be 11-foot lane width restriction. Benefits of this $9 million project include extending the life of the road, providing a smooth driving surface to increase ride comfort and increasing safety by improving drainage at spot locations to help disperse water during times of rainfall.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

Over the next six years, IDOT is planning to improve more than 3,200 miles of highway and nearly 9 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide on 7,897 miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 6 updates, follow us on Twitter at @IDOTDistrict6 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

###

 

 

 

 

`

Share

Latest stories

Website preview
Public comment sought on proposed Relocated Illinois 3 improvements in St. Clair County
ST. CLAIR COUNTY – The Illinois Department of Transportation will hold a public meeting to discuss a study for the proposed improvements to approximately two miles of the Relocated Illinois 3 corridor in East St. Louis and Sauget. The meeting will be held:
illinois-department-of-transportation.prezly.com
Website preview
Pavement patching on I-70 in Bond County begins Nov. 3
GREENVILLE – The Illinois Department of Transportation today announced that Interstate 70 will be reduced to one lane in each direction between the Madison County line and the Fayette County line in Bond County beginning, weather permitting, Monday, Nov. 3, for pavement patching.
illinois-department-of-transportation.prezly.com
Website preview
Work on Interstate 72 bridges in Pike County begins Nov. 3
SPRINGFIELD – The Illinois Department of Transportation announced that work will begin on several bridges on Interstate 72 in Pike County between the New Salem/Pittsfield interchange (exit 31) and the Hull/Payson interchange (exit 10). Work will begin with pre-stage widening of the bridge shoulders starting Monday, Nov. 3. Work will continue in March with resurfacing and painting the bridge decks.
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov