Bridge repair project on Cleone Road over I-70 near Martinsville ​

EFFINGHAM – The Illinois Department of Transportation announced that a $1.8 million bridge repair project will begin on Cleone Road over I-70 May 11.

The project will be completed under stage construction, with one lane open at all times across the structure. Advance signs and signals will be in place in advance of the project to direct traffic over the bridge and through the interchange on and off ramps. As traffic approaches the signals, traffic should stay in their lane all the way up to the signal stop bar then proceed as the signals indicate. The project should be completed by the end of September. This project will improve safety and the smoothness of the pavement over I-70 for the traveling public.

Drivers are urged to pay close attention to changed conditions and obey the posted speed limits.

Over the next six years, IDOT is planning to improve more than 3,200 miles of highway and nearly 9 million square feet of bridge deck as part of Rebuild Illinois, which is investing $33.2 billion into all modes of transportation. Accomplishments through Year Six of Rebuild Illinois include almost $20.8 billion of improvements statewide on 7,897 miles of highway, 815 bridges and 1,181 additional safety improvements.

For IDOT District 7 updates, follow us on Twitter at @IDOTDistrict7 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

# # #

 

 

Share

Latest stories

Website preview
Website preview
Illinois 203 lane closures in St. Clair County begin May 11
MADISON – The Illinois Department of Transportation today announced that road repairs on Illinois 203 between Collinsville Road and the Madison County line in St. Clair County will require daily lane closures beginning, weather permitting, Monday, May 11. The closures will affect both northbound and southbound lanes. Motorists should expect delays and are encouraged to use alternate routes during the closure. Drivers are urged to reduce speed, remain alert for changing conditions, obey all construction signage, and refrain from using mobile devices while approaching and traveling through the work zone. The project is expected to be completed by early summer 2026.
illinois-department-of-transportation.prezly.com
Website preview
Lane closures on I-55/70 in St. Clair County begin May 18
MADISON – The Illinois Department of Transportation is continuing multiple coordinated improvements along the Interstate 55/70 corridor in St. Clair County to improve safety, mobility and road conditions. Beginning Monday, May 18, lane closures will be in place at the following locations to allow for pavement and structure repairs. Eastbound I-55/70 Between Exchange Avenue and Black Lane, traffic will be reduced to: • Two lanes during peak hours (approximately 4 p.m. to 6 p.m.) • One or two lanes during off-peak hours, as needed
illinois-department-of-transportation.prezly.com

Get updates in your mailbox

By clicking "Subscribe" I confirm I have read and agree to the Privacy Policy.

About Illinois Department of Transportation

Contact

2300 S. Dirksen Parkway Springfield, IL 62764

idot.illinois.gov