Overnight work on I-74 in Moline begins Oct. 19
MOLINE – The Illinois Department of Transportation announced today that weather permitting, overnight lane striping work on Interstate 74 in Moline will begin Monday, Oct. 19. The work zone will be from the south end of the Mississippi River bridge to the intersection of 27th Street and U.S. 6.
Work will begin at 8 p.m. each night and will conclude at 6 a.m. the following morning through Friday, Oct. 23. Up to two lanes will be closed at a time during the project.
Motorists can expect delays and should allow extra time for trips through this area and be prepared for slow and stopped traffic. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices, and be alert for workers and equipment.
For IDOT District 2 updates, follow us on X at @IDOTDistrict2 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.
Kristophere’ Owens
Paul Wappel
